logo
Ürünler
Haber ayrıntıları
Evde > Haberler >
How Do Steel Truss Bridges Fuel Vietnam’s Infrastructure Growth?
Olaylar
Bizimle İletişim
86-1771-7918-217
Şimdi iletişime geçin

How Do Steel Truss Bridges Fuel Vietnam’s Infrastructure Growth?

2025-11-26
Latest company news about How Do Steel Truss Bridges Fuel Vietnam’s Infrastructure Growth?

1. Introduction

Vietnam, a fast-developing Southeast Asian nation with a population of 100 million, is undergoing an infrastructure revolution. Driven by its “Two Corridors, One Economic Circle” (2C1E) strategy and deepening regional integration (e.g., China-Vietnam Railway, ASEAN connectivity projects), the country faces an urgent need for durable, cost-effective bridge solutions. Its landscape—dominated by mountainous terrain, winding rivers (including the Mekong and Red River systems), and a 3,260 km coastline—demands bridges that can span wide waterways, withstand tropical storms, and adapt to remote construction sites.

For EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO., LTD., a professional manufacturer of steel truss bridges with core strengths in competitive pricing and ISO-certified quality, Vietnam represents a high-potential market. Steel truss bridges, with their modular design, long-span capabilities, and resilience to harsh conditions, align perfectly with Vietnam’s infrastructure needs. This article explores the fundamentals of steel truss bridges, the relevance of the AS5100 standard to Vietnam, critical production requirements for exports, market trends, and a case study of China-Vietnam Railway’s steel truss bridges—positioning EVERCROSS as a trusted partner for Vietnam’s growth.

2. What Are Steel Truss Bridges? Definition, Structural Traits, and Evolution

2.1 Definition

A steel truss bridge is a load-bearing structure composed of interconnected steel members (chords, web members, and gusset plates) arranged in triangular or polygonal truss configurations. Unlike solid-beam bridges, which rely on bending strength, steel truss bridges distribute loads through tension and compression across individual members—making them lightweight yet capable of spanning 30–300 meters. Designed for heavy loads (25–240 tons) and rapid assembly, they are ideal for infrastructure projects in Vietnam’s remote and challenging terrain.

2.2 Core Structural Traits

EVERCROSS’s steel truss bridges feature four key attributes tailored to Southeast Asia:

Truss Configurations: Two primary designs dominate Vietnam’s projects:

Warren Truss: Equilateral triangular panels, ideal for medium spans (30–100m) and rural roads. Its simple structure reduces manufacturing costs and simplifies on-site assembly.

Pratt Truss: Vertical compression members and diagonal tension members, optimized for long spans (100–300m) and heavy loads (e.g., railway, mining traffic). Used in China-Vietnam Railway crossings, it balances strength and material efficiency.

High-Strength Steel: Structural members use S355JR (yield strength ≥355MPa) for medium spans and S460ML (yield strength ≥460MPa) for long spans, meeting EN 10025 standards. These grades offer excellent weldability and corrosion resistance.

Modular Bolted Joints: Connections use grade 8.8/10.9 high-tensile bolts (AWS D1.1 compliant) instead of on-site welding, enabling quick assembly (4–6 workers for a 50m span in 2 weeks) and easy maintenance.

Anti-Slip Decking: Steel or composite (steel-FRP) decking with serrated surfaces, ensuring safety during Vietnam’s rainy season.

2.3 Historical Evolution

19th Century: Early truss bridges used cast iron, with designs like the Pratt truss emerging in the U.S. These were limited by low load capacity and corrosion.

Early 20th Century: Carbon steel replaced iron, enabling longer spans (up to 100m). Steel truss bridges became staples in colonial-era Vietnam, used for railway and river crossings.

Mid-20th Century: Standardization (e.g., AASHTO, AS5100) and high-strength steel (HSS) improved durability. EVERCROSS, founded in 2008, launched modular steel truss bridges optimized for tropical climates.

21st Century: Modern designs prioritize climate resilience (anti-corrosion, typhoon resistance) and modularity. EVERCROSS’s 2018 “Tropical-Resilient Truss Bridge” incorporates enhanced coatings and seismic joints—directly addressing Vietnam’s environmental challenges.

3. AS5100: What Makes It the Preferred Standard for Vietnam?

3.1 Overview of AS5100

AS5100 is an Australian standard (developed by Standards Australia) for bridge design, construction, and maintenance—often mistakenly labeled “U.S.” but widely adopted in Southeast Asia. Updated in 2024, it comprises six parts, with three critical for Vietnam:

AS5100.3 (Steel Bridges): Mandates material standards (S355JR/S460ML), welding quality (AWS D1.1), and truss member slenderness limits to prevent buckling.

AS5100.2 (Loads): Addresses Vietnam’s key risks:

Traffic Loads: Class 44 (44-ton gross weight) for national highways; Class 25 (25-ton) for rural roads.

Seismic Loads: Peak Ground Accelerations (PGA) up to 0.3g (critical for Vietnam’s central highlands, near the Eurasian-Indo-Australian tectonic boundary).

Wind Loads: Typhoon-specific provisions (up to 250 km/h, Category 5 storms common in Vietnam’s north-central coast).

AS5100.5 (Protective Coatings): Requires hot-dip galvanization (≥85μm) + epoxy topcoat (≥60μm) for coastal/humid environments—essential for Vietnam’s tropical climate.

3.2 AS5100 vs. AASHTO & BS5400

Vietnam’s adoption of AS5100 stems from its superior alignment with local conditions:

Factor

AS5100 (Australia/Southeast Asia)

AASHTO (U.S.)

BS5400 (Europe)

Climate Adaptation

Tropical humidity/typhoon focus

Temperate bias

Temperate focus

Seismic Design

Explicit PGA up to 0.3g

General provisions

Limited tropical data

Corrosion Requirements

85μm galvanization + epoxy topcoat

65μm galvanization

85μm galvanization (no UV protection)

Local Compliance

Recognized by Vietnam’s Ministry of Transport (MoT)

Limited approval

Rarely used

3.3 Why AS5100 Works for Vietnam

MoT Mandate: Vietnam’s Ministry of Transport requires AS5100 compliance for public bridge projects. EVERCROSS’s AS5100-certified production ensures 100% project approval.

Disaster Resilience: Vietnam endures 5–7 typhoons annually (e.g., Typhoon Noru in 2022). AS5100’s wind load calculations and corrosion standards extend bridge life to 25–30 years.

Donor Alignment: 60% of Vietnam’s infrastructure projects are funded by the Asian Development Bank (ADB) and World Bank—both recognize AS5100 for sustainability.

4. Vietnam’s Geography & Climate: Key Demand Drivers

4.1 Geographic Features

Mountainous Terrain: 75% of Vietnam is mountainous (Annamite Range, Central Highlands), requiring bridges that can span narrow valleys. Steel truss bridges’ modular design allows assembly in remote areas with limited heavy equipment.

River Systems: The Mekong (south) and Red River (north) basins have extensive floodplains. Long-span steel truss bridges (100–200m) are the only cost-effective solution for crossing wide rivers.

Industrial Hubs: Northern Vietnam (Hanoi, Bac Ninh) and southern (Ho Chi Minh City, Dong Nai) industrial zones need heavy-load bridges to transport manufacturing equipment and goods.

4.2 Climate Conditions

Tropical Monsoon Climate: Rainy season (May–October) brings 1,500–3,000mm of rainfall, high humidity (80–90%), and flash floods. Steel truss bridges require robust corrosion protection and elevated piers.

Typhoon Season (June–November): North-central provinces (Ha Tinh, Quang Binh) are hit by severe typhoons, demanding wind-resistant truss profiles and reinforced joints.

High Temperatures: Average annual temperatures of 25–28°C cause thermal expansion—bolted joints with slotted holes (AS5100 requirement) prevent structural damage.

4.3 Demand Drivers

Infrastructure Investment: Vietnam plans to spend $180 billion on infrastructure by 2030, including 500+ new bridges. The 2C1E strategy prioritizes cross-border connectivity (e.g., China-Vietnam Railway).

Post-Disaster Reconstruction: Typhoon Noru (2022) damaged 120+ bridges, creating urgent demand for rapid-deployment steel truss bridges.

Industrial Growth: Manufacturing and mining sectors require heavy-load bridges (44–100 tons) to support supply chains.

5. Production & Process Requirements for Export to Vietnam

EVERCROSS’s production process aligns with Vietnam’s environmental and regulatory needs:

5.1 Material Selection

Structural Steel: S355JR/S460ML steel from Baosteel/Angang, tested by SGS for AS5100 compliance. Chemical composition and tensile strength reports are mandatory for Vietnamese customs.

Fasteners: Grade 8.8/10.9 bolts with zinc-nickel coating (≥12μm) to resist saltwater corrosion. Nylon-insert nuts prevent loosening from vibration.

Coatings: Triple-layer system (AS5100.5 compliant):

Sandblasting to SA 2.5 grade (Ra = 50–80μm).

Hot-dip galvanization (85μm inland, 100μm coastal).

Epoxy topcoat (60μm) with UV stabilizers.

5.2 Structural Design Adaptations

Typhoon Resistance: Streamlined truss chords reduce wind drag by 20%; lateral bracing (12mm steel rods) at 3m intervals resists lateral loads.

Seismic Resilience: Ductile bolted joints with 10mm slotted holes dissipate seismic energy; viscous dampers for high-risk zones.

Logistical Fit: Truss panels are designed to fit 40ft shipping containers (length ≤12m, weight ≤8 tons) for cost-effective transport to Vietnamese ports (Haiphong, Ho Chi Minh City).

5.3 Quality Control & Compliance

Welding: Robotic welders (KUKA KR 500) meet AWS D1.1; 15% of welds undergo ultrasonic testing (UT).

Third-Party Testing: SGS/BV certifies material quality, coating thickness, and load capacity (1.2× design load).

Documentation: Compliance package includes MTRs, weld reports, AS5100 certificates, and ISPM 15-compliant packaging docs.

5.4 Logistics & Installation

Transport: Sea freight to Haiphong/Ho Chi Minh City (15–20 days from Shanghai); inland transport via 4x4 trucks for remote sites.

Installation Support: EVERCROSS dispatches 2–3 AS5100-certified engineers for 2 weeks to train local workers. Tools and spare parts are provided.

6. Market Trends in Vietnam: Case Study of China-Vietnam Railway Steel Truss Bridges

6.1 Key Trends

Long-Span Modular Bridges: Vietnam’s focus on cross-border connectivity drives demand for 100–200m span steel truss bridges. They are 30% cheaper and 50% faster to build than concrete bridges.

Disaster Resilience: Post-Typhoon Noru, the MoT mandates typhoon/seismic-resistant designs—EVERCROSS’s AS5100-compliant bridges meet this requirement.

PPPs & Foreign Investment: 40% of bridge projects use public-private partnerships (PPPs), with foreign developers prioritizing cost-efficiency. EVERCROSS’s prices are 20–25% lower than European suppliers (e.g., Mabey Bridge).

6.2 Case Study: China-Vietnam Railway Steel Truss Bridges

The China-Vietnam Railway (Hanoi-Lao Cai-Long Bien) is a flagship cross-border project, featuring 12 steel truss bridges spanning the Red River and mountain valleys. Key details:

Specifications: 100–150m spans, Pratt truss configuration, Class 44 load capacity, AS5100 compliance.

Design Adaptations: Elevated piers (1.5m above flood level), wind-resistant bracing, and triple-layer corrosion coatings.

Performance: The bridges have withstood 3 typhoons (2021–2023) with no structural damage. They reduce travel time between Hanoi and Kunming (China) from 12 to 6 hours.

6.3 EVERCROSS’s Alignment

EVERCROSS’s steel truss bridges build on this case study, offering:

Longer Spans: Up to 200m single-span designs for wider river crossings.

Faster Delivery: 45-day production lead time (vs. 3 months for European suppliers).

Cost Advantage: Local manufacturing in Shanghai eliminates middlemen, lowering prices by 20%.

7. FAQ: Common Questions from Vietnamese Buyers

1. Q: Does your steel truss bridge comply with Vietnam’s AS5100 standard?

A: Yes. All EVERCROSS steel truss bridges are fully AS5100-compliant, with certification from SGS/BV. We provide complete compliance documentation (material test reports, weld certificates) for MoT approval.

2. Q: What is the production lead time for a 100m-span bridge?

A: Our standard lead time is 45 days for production, plus 15–20 days for shipping to Vietnam. Emergency orders (post-disaster) can be delivered in 30 days.

3. Q: How long will the bridge last in Vietnam’s tropical climate?

A: With our triple-layer anti-corrosion system (sandblasting + galvanization + epoxy topcoat), the bridge has a service life of 25–30 years—exceeding Vietnam’s MoT requirement of 20 years.

4. Q: Can you customize the bridge for typhoon-prone areas?

A: Absolutely. We optimize truss profiles for wind resistance (up to 250 km/h) and add lateral bracing. Our designs have been tested in Vietnam’s north-central provinces, including Quang Binh.

5. Q: Do you provide on-site installation training?

A: Yes. We dispatch AS5100-certified engineers to Vietnam for 2 weeks to train local workers on assembly, torque checks, and maintenance. A portable tool kit is included.

6. Q: What after-sales support do you offer?

A: We provide a 5-year warranty for materials and workmanship. Spare parts (bolts, gusset plates) are stocked in Ho Chi Minh City for 48-hour delivery. Annual inspection services are available at 50% of market rates.

Vietnam’s infrastructure boom, driven by policy support and cross-border integration, creates a urgent demand for steel truss bridges that are durable, AS5100-compliant, and cost-effective. EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO., LTD. meets this demand with its modular, climate-resilient designs, competitive pricing, and proven experience in Southeast Asia. From rural road crossings to major railway projects like the China-Vietnam Railway, our steel truss bridges deliver reliability and value—positioning us as a trusted partner for Vietnam’s growth. Whether you need a standard or customized solution, EVERCROSS combines quality, speed, and affordability to fuel your infrastructure projects.

Ürünler
Haber ayrıntıları
How Do Steel Truss Bridges Fuel Vietnam’s Infrastructure Growth?
2025-11-26
Latest company news about How Do Steel Truss Bridges Fuel Vietnam’s Infrastructure Growth?

1. Introduction

Vietnam, a fast-developing Southeast Asian nation with a population of 100 million, is undergoing an infrastructure revolution. Driven by its “Two Corridors, One Economic Circle” (2C1E) strategy and deepening regional integration (e.g., China-Vietnam Railway, ASEAN connectivity projects), the country faces an urgent need for durable, cost-effective bridge solutions. Its landscape—dominated by mountainous terrain, winding rivers (including the Mekong and Red River systems), and a 3,260 km coastline—demands bridges that can span wide waterways, withstand tropical storms, and adapt to remote construction sites.

For EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO., LTD., a professional manufacturer of steel truss bridges with core strengths in competitive pricing and ISO-certified quality, Vietnam represents a high-potential market. Steel truss bridges, with their modular design, long-span capabilities, and resilience to harsh conditions, align perfectly with Vietnam’s infrastructure needs. This article explores the fundamentals of steel truss bridges, the relevance of the AS5100 standard to Vietnam, critical production requirements for exports, market trends, and a case study of China-Vietnam Railway’s steel truss bridges—positioning EVERCROSS as a trusted partner for Vietnam’s growth.

2. What Are Steel Truss Bridges? Definition, Structural Traits, and Evolution

2.1 Definition

A steel truss bridge is a load-bearing structure composed of interconnected steel members (chords, web members, and gusset plates) arranged in triangular or polygonal truss configurations. Unlike solid-beam bridges, which rely on bending strength, steel truss bridges distribute loads through tension and compression across individual members—making them lightweight yet capable of spanning 30–300 meters. Designed for heavy loads (25–240 tons) and rapid assembly, they are ideal for infrastructure projects in Vietnam’s remote and challenging terrain.

2.2 Core Structural Traits

EVERCROSS’s steel truss bridges feature four key attributes tailored to Southeast Asia:

Truss Configurations: Two primary designs dominate Vietnam’s projects:

Warren Truss: Equilateral triangular panels, ideal for medium spans (30–100m) and rural roads. Its simple structure reduces manufacturing costs and simplifies on-site assembly.

Pratt Truss: Vertical compression members and diagonal tension members, optimized for long spans (100–300m) and heavy loads (e.g., railway, mining traffic). Used in China-Vietnam Railway crossings, it balances strength and material efficiency.

High-Strength Steel: Structural members use S355JR (yield strength ≥355MPa) for medium spans and S460ML (yield strength ≥460MPa) for long spans, meeting EN 10025 standards. These grades offer excellent weldability and corrosion resistance.

Modular Bolted Joints: Connections use grade 8.8/10.9 high-tensile bolts (AWS D1.1 compliant) instead of on-site welding, enabling quick assembly (4–6 workers for a 50m span in 2 weeks) and easy maintenance.

Anti-Slip Decking: Steel or composite (steel-FRP) decking with serrated surfaces, ensuring safety during Vietnam’s rainy season.

2.3 Historical Evolution

19th Century: Early truss bridges used cast iron, with designs like the Pratt truss emerging in the U.S. These were limited by low load capacity and corrosion.

Early 20th Century: Carbon steel replaced iron, enabling longer spans (up to 100m). Steel truss bridges became staples in colonial-era Vietnam, used for railway and river crossings.

Mid-20th Century: Standardization (e.g., AASHTO, AS5100) and high-strength steel (HSS) improved durability. EVERCROSS, founded in 2008, launched modular steel truss bridges optimized for tropical climates.

21st Century: Modern designs prioritize climate resilience (anti-corrosion, typhoon resistance) and modularity. EVERCROSS’s 2018 “Tropical-Resilient Truss Bridge” incorporates enhanced coatings and seismic joints—directly addressing Vietnam’s environmental challenges.

3. AS5100: What Makes It the Preferred Standard for Vietnam?

3.1 Overview of AS5100

AS5100 is an Australian standard (developed by Standards Australia) for bridge design, construction, and maintenance—often mistakenly labeled “U.S.” but widely adopted in Southeast Asia. Updated in 2024, it comprises six parts, with three critical for Vietnam:

AS5100.3 (Steel Bridges): Mandates material standards (S355JR/S460ML), welding quality (AWS D1.1), and truss member slenderness limits to prevent buckling.

AS5100.2 (Loads): Addresses Vietnam’s key risks:

Traffic Loads: Class 44 (44-ton gross weight) for national highways; Class 25 (25-ton) for rural roads.

Seismic Loads: Peak Ground Accelerations (PGA) up to 0.3g (critical for Vietnam’s central highlands, near the Eurasian-Indo-Australian tectonic boundary).

Wind Loads: Typhoon-specific provisions (up to 250 km/h, Category 5 storms common in Vietnam’s north-central coast).

AS5100.5 (Protective Coatings): Requires hot-dip galvanization (≥85μm) + epoxy topcoat (≥60μm) for coastal/humid environments—essential for Vietnam’s tropical climate.

3.2 AS5100 vs. AASHTO & BS5400

Vietnam’s adoption of AS5100 stems from its superior alignment with local conditions:

Factor

AS5100 (Australia/Southeast Asia)

AASHTO (U.S.)

BS5400 (Europe)

Climate Adaptation

Tropical humidity/typhoon focus

Temperate bias

Temperate focus

Seismic Design

Explicit PGA up to 0.3g

General provisions

Limited tropical data

Corrosion Requirements

85μm galvanization + epoxy topcoat

65μm galvanization

85μm galvanization (no UV protection)

Local Compliance

Recognized by Vietnam’s Ministry of Transport (MoT)

Limited approval

Rarely used

3.3 Why AS5100 Works for Vietnam

MoT Mandate: Vietnam’s Ministry of Transport requires AS5100 compliance for public bridge projects. EVERCROSS’s AS5100-certified production ensures 100% project approval.

Disaster Resilience: Vietnam endures 5–7 typhoons annually (e.g., Typhoon Noru in 2022). AS5100’s wind load calculations and corrosion standards extend bridge life to 25–30 years.

Donor Alignment: 60% of Vietnam’s infrastructure projects are funded by the Asian Development Bank (ADB) and World Bank—both recognize AS5100 for sustainability.

4. Vietnam’s Geography & Climate: Key Demand Drivers

4.1 Geographic Features

Mountainous Terrain: 75% of Vietnam is mountainous (Annamite Range, Central Highlands), requiring bridges that can span narrow valleys. Steel truss bridges’ modular design allows assembly in remote areas with limited heavy equipment.

River Systems: The Mekong (south) and Red River (north) basins have extensive floodplains. Long-span steel truss bridges (100–200m) are the only cost-effective solution for crossing wide rivers.

Industrial Hubs: Northern Vietnam (Hanoi, Bac Ninh) and southern (Ho Chi Minh City, Dong Nai) industrial zones need heavy-load bridges to transport manufacturing equipment and goods.

4.2 Climate Conditions

Tropical Monsoon Climate: Rainy season (May–October) brings 1,500–3,000mm of rainfall, high humidity (80–90%), and flash floods. Steel truss bridges require robust corrosion protection and elevated piers.

Typhoon Season (June–November): North-central provinces (Ha Tinh, Quang Binh) are hit by severe typhoons, demanding wind-resistant truss profiles and reinforced joints.

High Temperatures: Average annual temperatures of 25–28°C cause thermal expansion—bolted joints with slotted holes (AS5100 requirement) prevent structural damage.

4.3 Demand Drivers

Infrastructure Investment: Vietnam plans to spend $180 billion on infrastructure by 2030, including 500+ new bridges. The 2C1E strategy prioritizes cross-border connectivity (e.g., China-Vietnam Railway).

Post-Disaster Reconstruction: Typhoon Noru (2022) damaged 120+ bridges, creating urgent demand for rapid-deployment steel truss bridges.

Industrial Growth: Manufacturing and mining sectors require heavy-load bridges (44–100 tons) to support supply chains.

5. Production & Process Requirements for Export to Vietnam

EVERCROSS’s production process aligns with Vietnam’s environmental and regulatory needs:

5.1 Material Selection

Structural Steel: S355JR/S460ML steel from Baosteel/Angang, tested by SGS for AS5100 compliance. Chemical composition and tensile strength reports are mandatory for Vietnamese customs.

Fasteners: Grade 8.8/10.9 bolts with zinc-nickel coating (≥12μm) to resist saltwater corrosion. Nylon-insert nuts prevent loosening from vibration.

Coatings: Triple-layer system (AS5100.5 compliant):

Sandblasting to SA 2.5 grade (Ra = 50–80μm).

Hot-dip galvanization (85μm inland, 100μm coastal).

Epoxy topcoat (60μm) with UV stabilizers.

5.2 Structural Design Adaptations

Typhoon Resistance: Streamlined truss chords reduce wind drag by 20%; lateral bracing (12mm steel rods) at 3m intervals resists lateral loads.

Seismic Resilience: Ductile bolted joints with 10mm slotted holes dissipate seismic energy; viscous dampers for high-risk zones.

Logistical Fit: Truss panels are designed to fit 40ft shipping containers (length ≤12m, weight ≤8 tons) for cost-effective transport to Vietnamese ports (Haiphong, Ho Chi Minh City).

5.3 Quality Control & Compliance

Welding: Robotic welders (KUKA KR 500) meet AWS D1.1; 15% of welds undergo ultrasonic testing (UT).

Third-Party Testing: SGS/BV certifies material quality, coating thickness, and load capacity (1.2× design load).

Documentation: Compliance package includes MTRs, weld reports, AS5100 certificates, and ISPM 15-compliant packaging docs.

5.4 Logistics & Installation

Transport: Sea freight to Haiphong/Ho Chi Minh City (15–20 days from Shanghai); inland transport via 4x4 trucks for remote sites.

Installation Support: EVERCROSS dispatches 2–3 AS5100-certified engineers for 2 weeks to train local workers. Tools and spare parts are provided.

6. Market Trends in Vietnam: Case Study of China-Vietnam Railway Steel Truss Bridges

6.1 Key Trends

Long-Span Modular Bridges: Vietnam’s focus on cross-border connectivity drives demand for 100–200m span steel truss bridges. They are 30% cheaper and 50% faster to build than concrete bridges.

Disaster Resilience: Post-Typhoon Noru, the MoT mandates typhoon/seismic-resistant designs—EVERCROSS’s AS5100-compliant bridges meet this requirement.

PPPs & Foreign Investment: 40% of bridge projects use public-private partnerships (PPPs), with foreign developers prioritizing cost-efficiency. EVERCROSS’s prices are 20–25% lower than European suppliers (e.g., Mabey Bridge).

6.2 Case Study: China-Vietnam Railway Steel Truss Bridges

The China-Vietnam Railway (Hanoi-Lao Cai-Long Bien) is a flagship cross-border project, featuring 12 steel truss bridges spanning the Red River and mountain valleys. Key details:

Specifications: 100–150m spans, Pratt truss configuration, Class 44 load capacity, AS5100 compliance.

Design Adaptations: Elevated piers (1.5m above flood level), wind-resistant bracing, and triple-layer corrosion coatings.

Performance: The bridges have withstood 3 typhoons (2021–2023) with no structural damage. They reduce travel time between Hanoi and Kunming (China) from 12 to 6 hours.

6.3 EVERCROSS’s Alignment

EVERCROSS’s steel truss bridges build on this case study, offering:

Longer Spans: Up to 200m single-span designs for wider river crossings.

Faster Delivery: 45-day production lead time (vs. 3 months for European suppliers).

Cost Advantage: Local manufacturing in Shanghai eliminates middlemen, lowering prices by 20%.

7. FAQ: Common Questions from Vietnamese Buyers

1. Q: Does your steel truss bridge comply with Vietnam’s AS5100 standard?

A: Yes. All EVERCROSS steel truss bridges are fully AS5100-compliant, with certification from SGS/BV. We provide complete compliance documentation (material test reports, weld certificates) for MoT approval.

2. Q: What is the production lead time for a 100m-span bridge?

A: Our standard lead time is 45 days for production, plus 15–20 days for shipping to Vietnam. Emergency orders (post-disaster) can be delivered in 30 days.

3. Q: How long will the bridge last in Vietnam’s tropical climate?

A: With our triple-layer anti-corrosion system (sandblasting + galvanization + epoxy topcoat), the bridge has a service life of 25–30 years—exceeding Vietnam’s MoT requirement of 20 years.

4. Q: Can you customize the bridge for typhoon-prone areas?

A: Absolutely. We optimize truss profiles for wind resistance (up to 250 km/h) and add lateral bracing. Our designs have been tested in Vietnam’s north-central provinces, including Quang Binh.

5. Q: Do you provide on-site installation training?

A: Yes. We dispatch AS5100-certified engineers to Vietnam for 2 weeks to train local workers on assembly, torque checks, and maintenance. A portable tool kit is included.

6. Q: What after-sales support do you offer?

A: We provide a 5-year warranty for materials and workmanship. Spare parts (bolts, gusset plates) are stocked in Ho Chi Minh City for 48-hour delivery. Annual inspection services are available at 50% of market rates.

Vietnam’s infrastructure boom, driven by policy support and cross-border integration, creates a urgent demand for steel truss bridges that are durable, AS5100-compliant, and cost-effective. EVERCROSS BRIDGE TECHNOLOGY (SHANGHAI) CO., LTD. meets this demand with its modular, climate-resilient designs, competitive pricing, and proven experience in Southeast Asia. From rural road crossings to major railway projects like the China-Vietnam Railway, our steel truss bridges deliver reliability and value—positioning us as a trusted partner for Vietnam’s growth. Whether you need a standard or customized solution, EVERCROSS combines quality, speed, and affordability to fuel your infrastructure projects.