Ağır yüklü konteyner rulo hareket seti performans testi (4)

Diğer Videolar
August 23, 2024
Kategori Bağlantısı: Evercross Ekipmanı
Kısa: Discover the Heavy-Duty Container Roller Movement Set in action! This 25-ton capacity equipment is designed for efficient short-distance movement of standard shelters and shipping containers. Watch its performance test and learn how it enhances logistics operations with hydraulic lifting and mobility.
İlgili Ürün Özellikleri:
  • Designed for moving standard shelters and shipping containers with ease.
  • Hydraulic system locks reversely to prevent containers from falling.
  • Suitable for both 40ft and 20ft standard containers.
  • Includes moving wheels, lifting rods, and a hydraulic system for robust performance.
  • Enhances safety and efficiency in container handling operations.
  • Operated by 4 persons for installation and roll-up.
  • Ideal for military, disaster response, and industrial applications.
  • Comes with a detailed maintenance guide for long-term use.
Sorular:
  • What is the maximum weight capacity of the Moving Kitchen Hut Moving Lifting Container Equipment?
    The equipment has a maximum weight capacity of 25 tons, making it suitable for heavy-duty container movements.
  • How many people are required to operate the Container Movement Set?
    Four persons are needed for the installation and roll-up of the Container Movement Set to ensure safe and efficient operation.
  • What types of containers is this equipment compatible with?
    The Container Movement Set is compatible with both 40ft and 20ft standard containers, providing versatile handling solutions.
  • What safety features does the hydraulic system include?
    The hydraulic system can be locked reversely to prevent shelters or transportation containers from falling, ensuring safe and controlled lifting and movement.
İlgili videolar

Evercross Fabrikası

Evercross Fabrikası
August 26, 2024

Aşındırıcı Taşlama

Aşındırıcı Aletler
November 12, 2024

Evercross Fabrikası

Evercross Fabrikası
August 26, 2024

Evercross Fabrikası 2

Evercross Fabrikası
August 26, 2024

Modüler köprü 3

Çelik Bailey Köprüsü
August 23, 2024

Modüler köprü 2

Çelik Bailey Köprüsü
August 23, 2024

Bailey Köprüsü İskelesi

Bailey Köprüsü
August 20, 2024

Mozambik projesinin teslimi

Evercross Fabrikası
January 07, 2026